New Construction of a vacation villa in Cape Coral 2018 cont'd

 

Hurricane kevlar screens for new vacation home

 

Now the system in the roof overhang for the automated hurricane kevlar screens is installed. Inside, the last cables are pulled for broadband Internet, TV, telephone etc.

 

Drywall installed at vacation villa Cape Coral

 

The walls of the vacation villa are now closed with drywall

 

Smearing of drywall board joints

 

The last screws for the drywall boards are set, then the smearing of the board joints is done

 

Drywall of new construction home ready for paint

 

The drywall boards are prepared for the first coat of paint

 

Exterior stucco for future vacation home

 

The new construction home in Cape Coral now gets its exterior stucco

 

Aluminum rails installed on roof

 

The exterior stucco is finished and the aluminum rails on the roof for the roof tiles are installed

 

Garage painted and facia installed at new building

 

The garage has already been painted and the facia is now installed.

 

Cape Coral vacation home gets exterior paint

 

After the exterior paint one sees already a little better, how the future Cape Coral vacation home will look later

 

Tiles in living room installed

 

The tile installer has already laid the tiles in the living room

 

Walls tiles in showers going in at vacation home

 

The floor tiles in the other rooms as well as the wall tiles in the showers are installed

 

Roof tiles are being installed at new construction site

 

Meanwhile, the roof tiles are gong up. Flat roof tiles were chosen for the modern style.

 

Waterline tiles installed at pool

 

In the pool area, the waterline tiles are installed. These tiles are for decoration and are located directly at the future waterline of the pool and hot tub

 

Cabinets installed bu homebuilder

 

The floor and hanging cabinets were delivered and installed by the home builder

 

Kitchen cabinets installed for future vacation rental

 

The wall cabinets have reached their final destination in the kitchen of the future Cape Coral vacation rental

 

Shower tiles installed in master bathroom

 

Even in the bathrooms the cabinets are already installed and the new villa gets tiles in the shower

 

Cape Coral home gets garage doors and motors

 

The garage doors and the motors are installed as well as the ladder in the roof area. The painter continues inside

 

Roof of new construction home is ready

 

The roof is ready

 

Showers tiled and grouted

 

The modern ceiling moldings surrounding the coffered ceilings (with background light) are installed and the showers are tiled and grouted

 

Exterior of new house in Cape Coral gets final grading

 

The exterior of the new house in Cape Coral - the final dirt fill and grading is done

 

Soffits and air conditioning system installed

 

The soffits are now attached and the air conditioning system is installed on the platform under roof

 

New building gets floors installed

 

Now that the new building is cooled down and the humid air has been pulled out, the wooden floors can be installed in the bedrooms and closets

 

Here it goes on to part 3 of 4